I was trying to …
Move column to different place in table by drag and drop.
I was expecting …
Column would be moved.
Instead I’ve got …
I can’t drag column to another place.
Move column to different place in table by drag and drop.
Column would be moved.
I can’t drag column to another place.
This is a result of change introduced in 2023.1.1.3128 - Changing order of grid columns. Drag&drop was abandoned.
This topic was automatically closed 2 days after the last reply. New replies are no longer allowed.